1218-EngineeringReport
-------------------------------------------------------------------------------
Engineering Report
Date: Dec 18th 2015
Crew Engineer Name: Chiara Cocchiara
Diesel – 48%
Propane –59 %
Gasoline (5 Gallon containers for ATV) – 5
Water (trailer) measured in cm from the top of the water to the top of the tank – 25.5 cm
Water (static) measured in cm from the bottom of the tank to the top of the water– 35 cm
Trailer to Static Pump used – yes
Water (loft) – 11
Static to Loft Pump used - yes
Water Meter:
Atv # Oil Checked: 0
Atv # Fuel Used Gals: 0
Atv # Tires Status: 0
Atv # Hours Used Day: 0
Atv # Notes And Comments: 0
Summary of Engineering activities:
Everything looks okay from the engineering checks.
Questions and Concerns to Mission Support:
The trash is full, so we require the mission support to empty the bins.
ATV:
We checked the ATV (key number 3), and I attach pictures to the report. For instance, the key numbers are different from the numbers on the ATVs, and we will analyze tomorrow which keys correspond to which ATV, so we can avoid any ambiguity.
Rover:
I attach the pictures for the rover's problems reported yesterday.