101-EngineeringReport
ENGINEERING REPORT SOL 06
Date: 01 January 2016
Crew Engineer Name: MARC CAROFANO III
Diesel – 24 %
Propane – 40 psi
Gasoline (5 Gallon containers for ATV) – 2 EMPTY 5 GALLON JUGS
Water (trailer) measured in inches from the top– 16.5 IN
Water (static) measured in inches from the bottom – 27.0 IN
Trailer to Static Pump used – NO
Water (loft) – 12
Static to Loft Pump used – YES
Water Meter: 0102840.0
Atv # Oil Checked: YES
Atv # Fuel Used Gals: 0
Atv # Tires Status: GOOD
Atv # Hours Used Day: 1HR
Atv # Notes And Comments: ATV # 1 AND # 3 WHERE USED TODAY WITHOUT ISSUE
Summary of Engineering activities:
Notes:
Everything looks fine from the Engineering Checks
Questions and Concerns to Mission Support
REQUESTS
- HAVE GAS JUGS FILLED FOR ATVS