101-EngineeringReport

ENGINEERING REPORT SOL 06

Date: 01 January 2016

Crew Engineer Name: MARC CAROFANO III

Diesel – 24 %

Propane – 40 psi

Gasoline (5 Gallon containers for ATV) – 2 EMPTY 5 GALLON JUGS

Water (trailer) measured in inches from the top– 16.5 IN

Water (static) measured in inches from the bottom – 27.0 IN

Trailer to Static Pump used – NO

Water (loft) – 12

Static to Loft Pump used – YES

Water Meter: 0102840.0

Atv # Oil Checked: YES

Atv # Fuel Used Gals: 0

Atv # Tires Status: GOOD

Atv # Hours Used Day: 1HR

Atv # Notes And Comments: ATV # 1 AND # 3 WHERE USED TODAY WITHOUT ISSUE

Summary of Engineering activities:

Notes:

Everything looks fine from the Engineering Checks

Questions and Concerns to Mission Support

REQUESTS

- HAVE GAS JUGS FILLED FOR ATVS