330-EngineeringReport

Salutations Mission Support,

Crew 152A

Initial Engineering Report

Date: March 29, 2015

Crew Engineer Name: Samuel Thomas

Diesel – 5/8(62.5%)

Propane – 54%

Gasoline – 10 gallons in two 5-gal containers *one container was emptied today filling up the ATVs. Please advise; is 10 gallons enough for 1-2 EVAs/day for the rest of our rotation, or do we need to request more gasoline?

Water (trailer) –350 gal

Water (static) – 76 cm

Trailer to Static Pump used – no

Water (loft) – 45 gallons

Static to Loft Pump used – yes

Water Meter Day 1 (Gallons:95257.0)

Atv Oil Checked: ATV Number 1 needed oil; oil was re-filled; all other ATVs did not need oil

Atv Tires Status: ok

Atv Notes And Comments:

Summary of Engineering activities:

- Main generator still running as expected

- Internet connection via WiFi

- HALpr on

Questions and Concerns to Mission Support:

The door going from the lab to the suit room does not fully latch when closed, and as such, cannot be locked.

As crew 150 has already told Capcom, there is a water leak in front of the Hab. We know that it is not clean water but I just wanted to let you know that it is still leaking. (this data still relevant)

Thank you for your support!

Samuel Thomas