Diesel – 64%
Propane –50 %
Gasoline (5 Gallon containers for ATV) – 5
Water (trailer) measured in cm from the bottom– 15.5 cm
Water (static) measured in cm from the top – 33 cm
Trailer to Static Pump used – no
Water (loft) – 12
Static to Loft Pump used - yes
Water Meter:
Atv # Oil Checked: 0
Atv # Fuel Used Gals: 0
Atv # Tires Status: 0
Atv # Hours Used Day: 0
Atv # Notes And Comments: 0
Summary of Engineering activities:
All Engineering checks are done and show correct behaviour for the Hab activities.
Questions and Concerns to Mission Support:
When trying the ATVs, it was noticed that the the ATV with number 3 (key number) smoked. There seems to be a few problems.
Among the major ones we noted the breaks are permanently breaking the wheel . And also the air filter below the seat is wet and needs cleaning.
We require support for this one and for the already before reported ATV with number 2 , that is missing the battery.
-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=
SOL2
Chiara Cocchiara
NO EVAs done today.