1114-EngineeringReport

--------------------------------------------------------------------------------

Engineering Report

--------------------------------------------------------------------------------

Date: 14 November 2015

Crew Engineer Name: Joshua Timpe

Diesel – 100%

Propane – 34% (gauge at the top of the tank)

Gasoline 0% (5 Gal for ATV) [needs refill] - Each of 4 primary ATVs has between 25%-33% tank remaining

Water (trailer) – 20 cm from the bottom (yesterdays report was accidentally measured in inches)

Water (static) – 13 cm from top

Trailer to Static Pump used - Yes

Water (loft) – 40 gallons

Static to Loft Pump used - Yes

Water Meter 0101.078.4 Gallons on arrival (08/11/2015); 0101.538.6 on departure (11/14/2015)

Atv # Oil Checked: Oil indicators are checked

Atv # Fuel Used Gals: >5.0 gallons (since last refill of 5 gal tank)

Atv # Tires Status: Good condition (arrival)

Atv # Hours Used Day: 0 ATVs used today

Atv # Notes And Comments: 3 of 4 primary ATVs functioning, engine repeatedly quits on 4th ATV. Gasoline Tank for ATVs still needs refill. New oven (still in Hab work space) is larger than previous and modifications may need to be made in order to install. Only 3 working radio headphones, fourth headphone works intermittently.

Summary of Engineering activities:

    • Checked fuel stores for Hab and ATVs

    • Checked water stores

    • Cleaned and readied Hab for departure

Questions and Concerns to Mission Support: Need gasoline refill as noted above. ATV #11 will need to be evaluated.