209-CommanderReport
Commander Report
02/09/2014
Ondrej Doule
Crew 135 woke up to rainy day on Mars without electricity.
The power outage was caused by faulty generator. The problem was quickly resolved.
We had very effective day full of research activities inside and outside habitat accompanied by
crew reporters almost nonstop. All 7 experiments are now running, all crew members are collecting
data and working on preliminary results. We are smoothly collaborating with our crewmembers on the
orbit. We will be starting acoustic experiment this evening and compiling video footage from the
last days. Also, a compilation of the ongoing Google Glass experiment shall be completed by tonight.
We have extremely good cooks in our team - I am impressed how delicious dinner can be prepared
from dried and canned food.
Yes, we are effective team.
=====
CommanderCheckIn Report
02/09/2014
Ondrej Doule
Crew Physical Health:
All are well.
Eva Depart Time:
14:30
Eva Return Time:
17:30
Narrative Of Field Mission Results:
We discovered topographically very interesting area north of the base that will be explored again tomorrow for generic geology research and second reporters record.
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Hab Maint:
Power was down due to faulty diesel generator from approx. 02-06:00 morning till 08:30.
Rep Sched:
19:00 - 21:00
Tomorrow Plan:
- EVA07 ATV + continuing with Google Glass and 4ii EXP
- Acoustic experiment location selection and calibration
- FMECA preliminary data compilation
- MDRS surroundings CAD
Inventory:
---
Support Req:
The path to the green house is dangerous, the paving grid sinked in the mud due to warm weather and rain in the morning. Advice whether there are spare grid tiles or whether we should dig out the current tiles and raise them up / or how to proceed. The greenhouse is being used for daily research.
Miscelleneous:
Power Outage: Responsible person for power generator was contacted twice. The problem with the generator is resolved.