323-EngineeringReport

Hello Mission Support,

Engineering Report

Date: March 23, 2015

Crew Engineer Name: Mehdi Scoubeau

Diesel – 75%

Propane – 55%

Gasoline – 10 gallons in tank

Water (trailer) – distance from top: 68 cm

Water (static) – distance from top: 36 cm

Trailer to Static Pump used - yes

Water (loft) – 22 gallons

Static to Loft Pump used – yes

Atv # Oil Checked: ATV1 and ATV4 to be filled tomorrow (we were already late when we came back from EVA)

Atv # Fuel Used Gals: we will fill the tanks tomorrow during the engineering check and I will report the used gals

Atv # Tires Status: all ok

Atv # Hours Used Day: ATV1 and ATV4 for 1h15min

Atv # Notes And Comments: all ok

Summary of Engineering activities:

- I prepared the EVA of tomorrow by cleaning the helmets and the headsets/micros.

- On main generator

- Internet connection via WiFi

- HALpr on

Questions and Concerns to Mission Support:

- Some pages (“record eva plan” and “explore possible eva routes”, for example) on HALpr do not seem to be available because of an “internal server error”.

Thank you,

Mehdi Scoubeau