> Date: 03/01/2016 at 6:30p.m.
>
>
>
> Crew Engineer Name: Louis Maller
>
>
>
> Diesel – 10%
>
>
>
> Propane – 53%
>
>
>
> Gasoline (5 Gallon containers for ATV) – 1 full
> container, one empty
>
> (which was placed in the trailer)
>
>
>
> Water (trailer) measured in cm from the bottom– 19in
> / 42in i.e.
>
> 48cm/106.6cm from the bottom (full)
>
>
>
> Water (static) measured in cm from the top – 18in / 42in
> i.e.
>
> 45cm/106.6cm from the top (refill scheduled tomorrow)
>
>
>
> Trailer to Static Pump used – 21in i.e. 0cm
>
>
>
> Water (loft) – 75 liters i.e. 20 gallons
>
>
>
> Static to Loft Pump used – 33 gallons i.e. 124 liters
>
>
>
> Water Meter: 105 259.1 gallons
>
>
>
> Atv # Oil Checked: all ATVs full
>
>
>
> Atv # Fuel Used Gals: Some due to today’s EVA
>
>
>
> Atv # Tires Status: No tire problems
>
>
>
> Atv # Hours Used Day: 1h30
>
>
>
> Atv # Notes and Comments:
>
> ATV#3 OK
>
> ATV#2 OK
>
> Red Honda OK but has some problems with the gear box
> according to the
>
> crewmember that used it today
>
>
>
> Summary of Engineering activities:
>
>
>
> Static tank partly filled from trailer tank: half-filled, it
> should be
>
> enough for the rest of the EVA
>
>
>
> Backpacks : Crew Scientist fixed backpack #1 and is going
> through
>
> spare parts to maybe build another one
>
>
>
> Helmets: Some bubble wrap was put inside the helmets using
> duct tape
>
> to minimize friction on the head (those helmets really hurt
>
> sometimes). It proved both useful and robust during
> today’s EVA.
>
>
>